Find out where your organization stands.

    Four engagements.
    Four sectors.
    One consistent outcome.

    Every Challenge listed below was already costing the organization money before the engagement started. Every Result listed is still functioning inside that organization today — not because a consultant is still there, but because the systems belong to the people who built them.

    What these case studies prove

    The four barriers don't care what industry you're in.

    Fear of expression. Lack of communication. Lack of written procedure. Lack of formal training. These four barriers are present in oilfield services companies in Nigeria, lumber distributors in the American South, public universities in Colorado, and electrical contractors in the mid-market. The faces change. The barriers don't. The methodology that resolves them doesn't either.

    Case Study 01 · Featured Engagement
    Energy Services

    Oildata Wireline Services

    Port Harcourt, Nigeria · Project duration: 26 months

    A fast-growing oilfield services company hit a growth plateau and rising rework while competing with global majors. Oildata had grown from 2 to nearly 70 employees in 10 years — but rapid growth without documented systems created a "blame culture" where quality failures were blamed on individuals, not processes. Oildata partnered with SABS to restore service reliability, replace verbal hand-offs with written systems, and equip every team — from drivers to engineers — to deliver consistent quality.

    Challenges

    • Plateaued revenue after years of 30%+ growth
    • Frequent service-quality failures and report errors
    • Verbal requests, missed appointments, lost invoices, document hunts
    • Stretched resources, burnout, sagging morale — "blame culture"

    Solution

    • Company-wide rollout of SABS's 4-Barriers program with BaseWork Centers
    • Built FAST order-request workflow — moved requests off verbal channels
    • Authored and adopted the Q-66 — a 66-step, end-to-end service process
    • Monthly, hour-long training for every team over 26 months

    Key Results

    55% → 70%+
    Job Quality Rating (JQR) — independent client evaluations, job-prep scores, and maintenance-efficiency ratings
    17 forms → 2
    Paperwork reduced by 88% — eliminating overhead of managing, filing, and tracking redundant documentation
    Punctuality, discipline, accountability normalized
    Culture shift documented across all teams by end of engagement
    The average Job Quality Rating, which measures quality of service delivery to our clients, has consistently grown from about 55% in 2006 to over 70% by the end of 2008.
    Emeka Ene · CEO, Oildata Wireline Services
    Case Study 02
    Higher Education

    Colorado Mesa University — CMU Tech

    Grand Junction, Colorado · Project duration: 26 months

    The first educational institution to pilot BaseWork Systems in a non-corporate environment. Leadership recognized that education suffers from the same systemic breakdowns as business — fear, poor communication, undefined procedures, and inconsistent training — and sought a scalable model for improvement.

    Challenges

    • Fragmented systems outside of classroom instruction
    • Weak cross-departmental alignment
    • Lack of written operational road maps
    • Interpersonal conflict driven by unclear accountability
    • Fear of addressing issues openly

    Solution

    • Implemented BaseWork Systems and the 4 Barriers to Quality framework
    • Defined BaseWork Centers for every role across the institution
    • Shifted conflict resolution from people to process
    • Reinforced BaseValues and the Two Rules organization-wide
    • Formalized Plan-Schedule-Manage-Monitor practices

    Key Results

    Reduced fear and improved transparency
    Organizational climate measurably improved across departments
    Clear ownership across departments
    Accountability structures documented and functioning
    Stronger cohesion and efficiency
    Team performance — cross-functional collaboration where silos previously existed
    First university
    To apply BaseWork Systems in an educational environment
    Case Study 03
    Building Materials & Manufacturing

    Harbert Lumber Company

    Lumber distribution & building materials · Project duration: Multi-year transformation

    Facing intense competition from national retailers, Harbert Lumber recognized that survival required operational efficiency and infrastructure — not just cost-cutting. Their multi-year partnership with SABS positioned them for accelerated growth and long-term competitiveness.

    Challenges

    • Market consolidation pressure from national big-box retailers
    • Inefficient labor utilization
    • Reactive operations lacking proactive planning
    • Difficulty scaling manufacturing initiatives
    • Limited system-level visibility across operations

    Solution

    • Full implementation of BaseWork Systems across the organization
    • Organized operations by BaseWork Centers for clarity and accountability
    • Formalized processes with end-to-end planning, scheduling, managing, and monitoring
    • Established infrastructure for sustainable growth rather than cost-cutting

    Key Results

    Labor costs reduced
    While simultaneously increasing output — efficiency gains without headcount cuts
    Launched profitable new divisions
    New business lines created during the engagement period
    Renewed capacity for expansion
    Strategic confidence restored — infrastructure now supports scale
    Multi-year transformation
    Ongoing relationship — methodology is embedded in daily operations
    Case Study 04
    Industrial Controls · Specialty Electrical Contracting

    Collins Control & Electric, Inc.

    Industrial controls · Specialty electrical contracting · Project duration: 26 months

    A mid-sized specialty contractor sought to improve predictability and leadership effectiveness by addressing operational variability. Through their engagement with SABS, Collins Control built the systems foundation needed for sustainable growth.

    Challenges

    • Inconsistent execution across projects
    • Informal accountability gaps between teams
    • Lack of defined operational systems
    • Leadership strain from reactive problem-solving

    Solution

    • Adopted BaseWork Systems with emphasis on system definition
    • Established clear leadership accountability structures
    • Implemented repeatable processes for consistent execution
    • Built operational predictability into daily workflows

    Key Results

    Consistent execution
    Operational predictability built into daily workflows
    Leadership alignment maintained
    Accountability structures continue to function
    Sustainable performance
    Improvements held after engagement — no ongoing outside support required
    Ongoing engagement
    The relationship continues — the methodology is self-sustaining
    Wondering what your own numbers look like? See what the current structure is costing →

    Ready to write your success story?

    Join these organizations. Let's discuss how we can deliver similar results for yours.