Every Challenge listed below was already costing the organization money before the engagement started. Every Result listed is still functioning inside that organization today — not because a consultant is still there, but because the systems belong to the people who built them.
Fear of expression. Lack of communication. Lack of written procedure. Lack of formal training. These four barriers are present in oilfield services companies in Nigeria, lumber distributors in the American South, public universities in Colorado, and electrical contractors in the mid-market. The faces change. The barriers don't. The methodology that resolves them doesn't either.
Port Harcourt, Nigeria · Project duration: 26 months
A fast-growing oilfield services company hit a growth plateau and rising rework while competing with global majors. Oildata had grown from 2 to nearly 70 employees in 10 years — but rapid growth without documented systems created a "blame culture" where quality failures were blamed on individuals, not processes. Oildata partnered with SABS to restore service reliability, replace verbal hand-offs with written systems, and equip every team — from drivers to engineers — to deliver consistent quality.
The average Job Quality Rating, which measures quality of service delivery to our clients, has consistently grown from about 55% in 2006 to over 70% by the end of 2008.
Grand Junction, Colorado · Project duration: 26 months
The first educational institution to pilot BaseWork Systems in a non-corporate environment. Leadership recognized that education suffers from the same systemic breakdowns as business — fear, poor communication, undefined procedures, and inconsistent training — and sought a scalable model for improvement.
Lumber distribution & building materials · Project duration: Multi-year transformation
Facing intense competition from national retailers, Harbert Lumber recognized that survival required operational efficiency and infrastructure — not just cost-cutting. Their multi-year partnership with SABS positioned them for accelerated growth and long-term competitiveness.
Industrial controls · Specialty electrical contracting · Project duration: 26 months
A mid-sized specialty contractor sought to improve predictability and leadership effectiveness by addressing operational variability. Through their engagement with SABS, Collins Control built the systems foundation needed for sustainable growth.
Join these organizations. Let's discuss how we can deliver similar results for yours.
Four numbers, and you'll see what your current structure costs each year.
Run the numbers →Full breakdown by headcount, with add-ons and one-time fees.
See pricing →No obligation. A focused conversation about fit.
Start the conversation →